This is an incomplete list of documents related with μ-Collider/ ν Factory and MuCool Test Area.
Please, feel free to send me your favor docs.

One can find in this page mechanical drawing numbers relevant to the project one way or the other.

Table of Contents
MuCool/Muon Collider documentation
MTA documentation
As-Built
General Info
Radiation
Beam line Design
Experimental Hall
Instrumentation
Relevant Mechanical Drawings
LomaLinda Stands
200MeV Stands
Linac
Booster
Beamline Layout
SQA
Shielding Blocks

Muon Collider and Neutrino Factory Documentation

Doc #
Title
Date
1
μ-Cool Test Area
NA
2
Notes from ν Factory/μ-Collider
NA
3
ν Factory/μ-Collider Database
NA
4
Normal Conduction RF Cavity R&D for Neutrino Factory or Muon Collider
2006
5
MuCool
2004


MuCool Test Area Documentation

Doc #
Subject
Title
Author
Date
1
General Info
AAC August'07 talk
F. G. Garcia
August 8, 2007
1
As built
PowerSupply Requirements
B. Brooker
August 24, 2007
2
Rack Layout
M. Olson
August 24, 2007
3
Beam Stop
J. Misek
September 07, 2007
19
Radiation
RF Shielding Reconfiguration
D. Pushka
July 16, 2007
18
Shielding Reconfiguration 2
T. Kobilarcik
July, 2007
17
Shielding Reconfiguration 1
June,22 2007
16
Beam Stop
J. Misek
June,15 2007
15
Quad Against 12ft block
I. Rakhno
June,15 2007
14
Accident Scenario for MTA beam line
June,08 2007
13
Prompt dose above the 12-ft concrete shielding block with a penetration with ID of 8.75 inches
May,25 2007
12
Beam Stop for a single pulse
May,11 2007
11
Prompt Dose Downstream 12ft Shieldblocks
May, 4 2007
10
Accident Scenario on a Quadrupole in MTA Beam line Part II (ppt)
April, 2007
9
Accident Scenario on a Quadrupole in MTA Beam line Part I (ppt)
8
Summary of Radiation Shielding Studies for MTA (pdf)
August, 2006
7
Radiation Shielding Issues for MuCool Test Area at Fermilab
I. Rakhno,
C. Johnstone
May, 2005
6
Radiation Shielding Calculations for MuCool Test Area at Fermilab (pdf)
May, 2004
5
Drawing - Downstream Absorber CS (pdf)
Alber Russel
May, 2002
4
Blocks - Layout (3D)
N/A
3
Blocks - Size
N/A
2
Blocks - Configuration
N/A
1
Blocks - CS
N/A
1
Beam line design
Beam line layout V10-7.4
C. Johnstone, D. Schmitt
March 07, 2008
2
Beam line layout V10-5
C. Johnstone, D. Schmitt, J. Lackey, T. Anderson
June 20, 2007
3 (10-5-1)
Beam line Lattice File V10
C. Johnstone
June 22, 2007
3.1 (10-5)
June 5, 2007
4
Beam line layout V9
C. Johnstone, D. Schmitt
April 12, 2007
5
MTA Experimental Hall Elevation Survey data (.xls)
O'sheg Oshinowo, C. Johnstone
March 15, 2007
6(.xls)
6.1(.jpg)
Linac Ramp - Elevation Survey data
O'sheg Oshinowo
March, 2006
7
MuCool/Linac Diagnostic Beamline and MTA Facility (ppt)
C. Johnstone
November, 2005
8
A Simple Beam Line for the MuCool Test Area (pdf)
C. Ankenbrandt, et.al
February, 2004
9
The Muon Test Area at Fermilab (pdf)
M. Popovic
2004
1
Experimental Hall
Cryogenics for the MuCool Test Area (MTA)(pdf)
C. Darve, et.al.
2005
2
The MuCool Test Area Linac Experimental Facility at Fermilab
D. Errede et.al.
2003
1
Instrumentation
Pbar BPM Boards
Web page
N/A

Mechanical Drawings

In order to access the drawing you are interested on, write down the number and then click on ADMS I-Find . Add the number on the search field and voi-la!

DWG #
System
Title
Date
MD-37899
LomaLinda Stands
Loma Linda Quad stands (series of dwgs)
21-Sep-1995
MB-299810
400MeV Quad 5 Stand Assembly
15-Sep-1993
MB-299558
QUAD NO.5-SPECIAL STAND-FINAL STAND ASSEMBLY
15-Dec-1992
MB-299266
LOMA LINDA QUAD STAND-MAIN ASSEMBLY-QUAD MOUNT
16-Dec-1992
MD-19295
200MeV Stands
MOVABLE QAUDRUPOLE ASSEMBLY
14-Jun-1970
MD-19296
MOVABLE QUADRUPOLE STAND DETAIL
17-Jun-1970
MC-19298
MOVABLE QUAD MOUNT DETAIL MOD
18-Jun-1970
MC-19299
MOVABLE QUAD MOUNT SUBPLATE MOD
18-Jun-1970
MD-354098
Linac
Linac Extension Quad Main Support Plate Assembly
14-Jan-2005
MB-354100
Linac 2 X 1 1/2 Quick Disconnect Reducer for MuCool
14-Jan-2005
MD-354101
Linac 1 1/2 to 2 Quick Disconnect beam pipe with BPM Assembly
14-Jan-2005
ME-354102
Linac Chopper Upstream Modifications for MuCool Extraction
01-Mar-2005