| Beam Synch overview in MI era | |||||||
| TVBS,APTVBS,MIBS revolution markers not included | |||||||
| G. Vogel 4-14-06 | |||||||
| BS Event | System | Reflected TCLK Event | Typical TCLK Reference | (suggested) Delay Name | new/ modify/ redefine/ deassign/ unassign | description | Beam Permit/Aborts which must be permitting to encode event |
| $74 | MIBS | $A9 | $A5 | I:MINX | new | 120 GeV proton extraction from MI to NUMI | NUMI |
| $75 | MIBS | $39 | $30 | I:MIBLX | new | 120 GeV proton extraction from MI to SWYD | P1*P2*SWYD*BP120 |
| $76 | MIBS | $87 | $82 | D:DAP2X | 8 GeV extraction from Deb. to AP2 beamline | ||
| $77 | MIBS | none | none | xxx | new | 8 GeV Injection from Booster | |
| $79 | MIBS | $81 | $80 | I:MIPBTX | modified | 120 GeV proton extraction from MI to pbar target (was generated by $8C) | P1*P2*PB*BP120 |
| $7A | MIBS | $94 | $91 | I:AMIPBX | 8 GeV pbar transfer from Acc to MI | ||
| $7B | MIBS | $5B | $40 | I:MITPBX | 150 GeV pbar transfer from MI to TEV | ||
| $7C | MIBS | $5C | $4D | I:MITCPX | 150 GeV proton transfer from MI to TEV for collider | P1*TEV*BP150 | |
| $7D | MIBS | $86 | $85 | I:MIDX | 8 GeV transfer from MI to Deb. ("forward protons") | P1*P2*PB*BP8 | |
| $7E | MIBS | $99 | $93 | I:MIAX | 8 GeV proton transfer from MI to Acc. | P1*P2*PB*BP8 | |
| $D8 | MIBS | $55 | $5D | I:TMIPX | 150 GeV proton transfer from TEV to MI | MI*BP150 | |
| $DA | MIBS | none | hrdwr | I:DATRG | new | Data Acquisition Event | |
| $ED | MIBS | $FA | none | new | MIBS event request denied | ||
| $EE | MIBS | none | hrdwr | I:ETSTEV | new | Pbar Test Event | |
| $7C | TVBS | none | hrdwr | xxx | new | reflected MIBS $7C (Proton Injection MI=>Tev) | |
| $D9 | TVBS | $D9 | hrdwr | xxx | sudden Tevatron beam loss | ||
| $DA | TVBS | none | hrdwr | C:EVTDAX | new | Data Acquisition event | |
| $DB | TVBS | none | hrdwr | C:EVTDBX | new | Tevatron IPM Data Acquisition event | |
| $A0 | RRBS | $F0 | $E0 | R:MIRPBX | new | 8 GeV pbar transfer from MI to RR | |
| $A2 | RRBS | $F2 | $E2 | R:MIRPX | new | 8 GeV proton transfer from MI to RR | |
| $A3 | RRBS | $F3 | $E3 | R:RMIPX | new | 8 GeV proton transfer from RR to MI | |
| $A7 | RRBS | $F7 | $E4 | R:RMIPBX | new | 8 GeV pbar transfer from RR to MI | |
| $AA | RRBS | none | RR LLRF | xxx | new | RF/7; zero azimuth marker; occurs on every revolution | |
| $C0 | RRBS | none | RR LLRF | xxx | new | marker for injected beam; occurs on every revolution | |
| $C1 | RRBS | none | RR LLRF | xxx | new | offset (1/2 turn) marker for injected beam; occurs on every revolution | |
| $D0 | RRBS | $F5 | $E7 | R:RDMPX | new | event to fire RR dump kicker; placed on clock fixed wrt $AA | |
| $D1 | RRBS | none | $E5 | R:RPNGX | new | event to fire RR pingers; placed on clock fixed wrt $AA | |
| $D9 | RRBS | $F9 | hrdwr | xxx | new | generated on sudden beam loss in RR; placement on clock not clear | |
| $DA | RRBS | none | hrdwr | R:DATRG | new | Data Acquisition event | |
| NOTES | |||||||
| 1 | BP150 is a level which comes from the F0 Lambertson. A high level indicates the Lambertson is above a 150GeV threshold. | ||||||
| Last Updated on 4/14/06 | |||||||
| By vogel | |||||||
| Email: vogel@fnal.gov | |||||||